Site Prep and Layout
September 19 - 20, 2020
I neglected to get a picture of the untouched grass before I started in with the backhoe. Oh well. This picture isn't too far into the process:
The big ash tree on the right had some bigish roots running through the soil. I've got a rough outline of the building staked there so I can get a sense of what is level.
It became clear pretty early on that the grade was going to make for at least two steps to get into the building if I built it above grade. So (change of plans!) lets excavate down to make the building level below grade at the uphill side. That of course requires some kind of retaining wall there, which ultimately will be the weak spot for this building after a few decades.
After a considerable additional amount of digging the next day, I found there was a huge rock in the southeast corner. It wasn't going anywhere and wasn't persuadable with a cold chisel. So that became the de-facto lower limit of the "foundation." After working the site I decided (change of plans!) to make the front-back dimension 10'8" instead of 10' because there was room and it works out better to have an even number of 16 inch units in your lengths. I built a rough rock retainer, drove stakes and got the batter boards done:







Comments
Post a Comment