Roofing and Skylights

October 14-24, 2020

A patch of rainy weather delayed progress and created a layer of slip mud over the construction site. I attempted to minimize the wallow formation by laying out cardboard --- with partial success since the cardboard tended to slide around when I stepped on it.

The first step of roofing is getting up the drip edge flashing onto the eaves, fastened with 3/4" roofing nails. Short nails and bouncy eave boards led to a few lightly hammered fingertips and choice words. You always have to take a few extra nails up there with you to account for the ones that inevitably get away.

Starting on the higher west side, I created a jig of sorts to make up for the lack of a second pair of hands. This is accomplished by screwing some scrap 2x4 to the ends of the rafter tails so they extend beyond the eaves by the amount I want the roofing to overhang. To those I screw a cross 2x4x12 board thereby creating a stop which can hold the roofing before I get it screwed down as well as keep the edges aligned. Metal roofing goes up pretty fast if you have power nibblers to cut it --- something I invested in 30 years ago for the Vashon garage project.

Installing leak-proof skylights is probably the most challenging aspect of this project. I'll confess to being a skylight virgin with prurient observations over the years on how they can go wrong. They were very rare in my experience as a kid but common in Santa Fe and I feel in love with them then. Now I had an opportunity to create a pair from scratch. The first step was flashing (no pun intended) the bottom edge with two pieces (under/over) to create a edge the glass would sit on so water coming off the glass will end up on top of the roofing below:

The goal was clear: get the glass up there (actually a double-paned sliding glass door weighing in around 100 lbs), check how well it fits, lay down a bead of caulking, set the glass down on top of it and put some screws through the sliding glass door frame without a lot of sliding around.  I was not quite sure how to accomplish that but I knew for sure I couldn't put the glass at risk because there was exactly one for each opening I had framed. So I decided to start by getting the glass up there figuring I could confront what to do next by wrassling with the problem.  The metal roofing was just a bit too steep and just a bit too slick to be relied on for footing, so getting something to stand on was the first issue. That's a problem I've dealt with before: enter scaffold inside the shed and tractor front-end loader outside the shed. I'll talk about how I got the glass up there with my pictures for east side below, but suffice it to say I got the glass resting against the tractor bucket but it wouldn't stay on the frame without slipping down.  Studying on the problem:


Eventually it occurred that I needed a jig from the tractor bucket to hold the glass. I formed a U shape 2x4 jig that would sit in the bucket, cut to fit (with a couple trips up and down) so that the glass was just where it needed to be:

 


The homemade scaffold can be seen bottom right above - 4 long 2x4s attached with cross sticks to make a sturdy platform (I made that for the studio project and its been sitting in the barn waiting for another application since then). The hardest part of the task was lifting the glass, getting a bead of caulking down, then lowering the glass on top of it. The only point of leverage was standing inside on the scaffold and somehow hoisting the glass up and over and down. I ended up with a good bit of caulking on the back of my hands and in my hair. Fortunately (for the short term anyway) I was using the water soluble caulking so I could wash it off --- if it had been that silicon stuff I'd have been dealing with sticky fingers for days.

The last skylight step is to flash the edges over the top of the glass so water can't leak in from there, with more caulking involved of course.

Doing the east side was a lot easier because its closer to the ground and but mostly because now I knew how to do it. Start by roofing and flash the skylight bottom edge:

Here you can see the technique for getting the glass up there: a couple of planks as a ramp with a cross piece to form a resting stop between the lift-from-below and pull-from-above phases:



Scooch it around:

And repeat the caulking and final placement:
The views from below and above were pretty cool:

Of course that peak has got to be closed up. With the flashing I had special ordered the ridge metal bent to the correct angle and I got to say that really created a nice finish reminiscent of Faultline Brewing in Sunnyvale:

An unobstructed view from the inside on a rainy day: