Tool Organization and Final Grading
November 26-29
All the shed "furnishings" will be built in and firmly attached to the structure. But its (mostly) done with screws so easy enough to change in the future. The first order of business was the bench. The shed floor is 10'8" x 8' so that left a 16" x 8' end on the nice 3/4" plywood I used for the deck. Perfect for a bench. If I just hung it on the front of the studs it would leave 3" holes running along the back, which isn't very nice. Solution: fill the holes with 2x4 cross pieces. But you can't get those into the space anymore because the paneling is using ~ 1/2" in the back of the slot. So using 2x4 ends and one board purchased but not used, I ripped a notch with the table saw to provide a 3/4" by 1/2" notch. These were cut to fit snugly into each gap (yes, if I laid out 16" centers then each gap should have been exactly 14.5" but they weren't anymore and the outside siding had locked them in place). The notch protruding from the wall provided a ledge for the back of the bench to rest on.
Using a similar notching strategy on the outer facing edges of the plywood gives the bench a nice finished edge:
The mallet above is the best argument I have against a reluctant board. With the 2x4 supporting the front and the corner leg, the bench is stout enough for me to sit on with only a few cracking sounds of protest.
One of the most enjoyable parts of the project was gathering the tools from the half dozen places where heretofore they have been collecting in jumbled heaps. Using a combination of screws, scrap lumber and barn spikes (mega nails), the tools got up on the wall and grouped together. It became real obvious that my idea of leaving the Tyvek exposed was a non-starter --- that feedback from QA junior I discussed in the last post was high value. I needed that paneling on the back to have something to screw into for lighter mounts.
Hopefully the grouping will be enough of an indexing scheme so that when a tool needs to get re-stowed after use it will be obvious where it goes. I'm not one to pencil in tool outlines on the wall, because eventually that gets out of date.
Here, from right to left, you see the hoes (not Hos), forks, shovels, fancy forks and shovels with the rakes up behind them:
On the east wall, left to right, are hose and sprinkler items, hand tools mounted behind the bench, and a shelf for odds & ends.
On the back wall, at the end of the bench are marking supplies and ties, staking supplies, and a glove box (with the two horizontal sticks to hold them). Going from there to the right, we find shelves burdened with fertilizer and other supplies, brooms and brushes (admittedly outside the garden theme but at least they have handles), clippers, mauls/sledges and the specialized tool collection. Over the top are the woodsmen's tools which I don't use often these days so I thought they will serve some decorative function in the meantime.
A quick count came up with more than 200 items stored. No wonder it used to be so hard to find anything! Panorama shot looking out from the back:
The last task to be done is "Final Grading" AKA cleaning up the mess I'd created outside. I hadn't spent the required time on the front end of the small rock retaining wall and had been dancing around the bad footing during the whole construction period. Here is the starting state:
I decided find enough big rocks to have an at-level entrance to the left side of the porch, and with the pile of dirt in the back I created a small swale to encourage water coming from the hill on the left to drain around the building instead of under it.
I had I collected stones from the electrical ditching project and used them on the west side as a landing bed for the water coming off the shed roof. Without that it will splash dirt and mud on the side of the building for years until it washes it down to gravel.
After an afternoon carting away ends of roofing, boards that might have some use and boxing up the smaller pieces to be used in the campfire, I used the tractor to smooth out remain bumps and divots.

The one task we need to defer on (because it's November) is seed the bare dirt with Fescue. I'll get out there in early spring to take care of that.














Comments
Post a Comment